APG MonitorMaintenance
2 critical3
Maintenance
Asset-scoped log and PM schedule by equipment class.
PM overdue
3
Blocks for operator
Due in 14 d
4
Log entries · 180 d
10
Technician hours
34.5
Last 180 days
Preventive maintenance · sorted by due date
| Asset | Task | Cadence | Owner | Last done | Next due | Status |
|---|---|---|---|---|---|---|
| 52F22 | Breaker timing + contact resistance | annual | J. McBride | 2025-04-14 | 2026-04-14 | 9 d overdue |
| 52T3 | SF6 density + control power | semiannual | J. McBride | 2025-10-20 | 2026-04-18 | 5 d overdue |
| 52T2 | SF6 density + control power | semiannual | J. McBride | 2025-10-24 | 2026-04-22 | 1 d overdue |
| SG_A_T2.HVAC | HVAC filter + refrigerant | quarterly | DesertHVAC | 2026-01-22 | 2026-04-23 | 0 d |
| T3 | Calisto R9 calibration verification | monthly | J. McBride | 2026-03-26 | 2026-04-25 | 2 d |
| T1 | Calisto R9 calibration verification | monthly | J. McBride | 2026-03-29 | 2026-04-28 | 5 d |
| pq-site-04-dstat | IGBT thermal scan | quarterly | E. Zumwalt | 2026-03-08 | 2026-05-07 | 14 d |
| 52T1 | SF6 density + control power | semiannual | J. McBride | 2025-11-15 | 2026-05-14 | 21 d |
| T2 | Calisto R9 calibration verification | monthly | J. McBride | 2026-04-17 | 2026-05-17 | 24 d |
| T3 | Bushing tap seal inspection | semiannual | Yonan G. | 2025-12-08 | 2026-06-06 | 44 d |
| T1 | Bushing tap seal inspection | semiannual | Yonan G. | 2025-12-23 | 2026-06-21 | 59 d |
| SG_A_T2.Battery | Battery impedance sweep | quarterly | T. Sabat | 2026-03-31 | 2026-06-29 | 67 d |
| T3 | Oil sample to lab | annual | Yonan G. | 2025-08-18 | 2026-08-18 | 117 d |
| T2 | Bushing tap seal inspection | semiannual | Yonan G. | 2026-02-21 | 2026-08-20 | 119 d |
| T2 | Oil sample to lab | annual | Yonan G. | 2025-12-18 | 2026-12-18 | 239 d |
| T1 | Oil sample to lab | annual | Yonan G. | 2026-01-27 | 2027-01-27 | 279 d |
| 52F21 | Breaker timing + contact resistance | annual | J. McBride | 2026-03-23 | 2027-03-23 | 334 d |