3
T2

Main Power Transformer T2

ABB / GE (TBD) · 42 MVA, 69/34.5 kV Δ-Y · Site east-thistle

AlarmTier 1 criticalLead-time 2–3 yr
Headline signal
Winding hot-spot74.00 °C
Nameplate
MVA42 / 56 / 70 ONAN/ONAF/ONAF
HV69 kV
LV34.5 kV
VectorDyn1
Impedance8.5%
LTC Positions±10 × 0.625%
CoolingONAN/ONAF
Installed2026-09-15

Alarm history

Critical22m ago
C₂H₂ rise on T2 — possible arcing in oil
Acetylene climbed from 0.4 ppm → 2.3 ppm over last 14 days. Duval Triangle zone shifted D1 → D2 (high-energy arcing).
Warning1d ago
Winding hot-spot T2 above 90 °C
Winding RTD #2 touched 92 °C during peak load — fan stage 2 engaged. Cleared on its own.

Command palette

Search assets, alarms, sites, and quick actions

APG Copilot
Hi — I'm your APG assistant. Ask me anything: "any critical alarms?", "draft a DGA report for T2", "what spares are behind their lead time?"

Powered by CopilotKit